All,
Just a quick reminder to those that are following the ARTIC (Anaheim station) project. We are getting close to a contractor announcement and ground breaking.
Tomorrow (May 2) at 15:00 there will be a tour of the ARTIC job site for contractors/sub-contractors, and a networking opportunity afterwards.
Individuals wishing to participate in the
site walk must bring/wear personal protective
equipment including: 1) hard hat, 2) safety vest, 3)
eye protection and 4) steel-toed shoes.
ABSOLUTELY NO EXCEPTIONS WILL BE MADE.
You can download the informational pdf. file with map and directions (here).
http://www.articinfo.com/PDF/ARTIC%20Project%20Update_%20April%202012-%20Pre-Bid%20Workshop.pdf
Keep Flying On The Ground!
Ca/Nv Maglev News