We came across what appears to be a press-release "article" from Architypereview.com publishing additional details for the ARTIC (anaheim) station.
Here are some of the details but, we suggest going to the link and reading the entire story....
http://architypereview.com/17-train-stations/projects/479-anaheim-regional-transportation-intermodal-ce/description
[...]
ARTIC will be sized to accommodate the transportation services provided by the following operators:
• Metrolink
• Amtrak
• OCTA Local Bus
• Anaheim Resort Transit Shuttles and Circulators
• Anaheim Go Local rubber tired mixed-flow shuttles
• “Fly-Away” type Airport Shuttles
• Connection to off-site private intercity buses
• Private Tourism buses
• Taxi Services
The ARTIC Project components include:
• Main Intermodal Terminal building
• At-grade bus facility
• On-site surface parking and retention of the existing station’s surface parking
• Terminal site work
• Improvements within the LOSSAN corridor
• Stadium entrance
• Above-grade passenger concourse
• Off-site/Douglass Road work
Project Data:
Square Footage: | 66,000 sq. ft. |
---|---|
Site Size: | 16 acres |
LEED Rating: | Platinum |
Construction Cost: | $183.8 million |
Year Built: | 2014 |
[...]
Keep Flying On The Ground!
Ca/Nv Maglev News